Shandong Fiberglass Group’s annual production of 100,000 tons of 3-line technical transformation project successfully ignited
On the morning of October 22, the construction site of the 100,000-ton glass fiber technological transformation project of Fiberglass Group was crowded with people. The members of the Fiberglass Group’s home team, the person in charge of each construction profession and the person in charge of the main participating units attended the kiln ignition ceremony. At about 11 o’clock, after the torch relay ceremony ended, the kiln was successfully ignited, marking a key step in the construction of the digital production base of the Fiberglass Group Yishui Plant.
In recent years, the Fiberglass Group has actively responded to the national call to accelerate the pace of conversion of new and old kinetic energy. Following the completion of a digital fiberglass factory in the Yiyuan plant area, the pace of digital transformation in the Yishui plant area has continued to accelerate. The annual production of 100,000 tons of glass fiber technical transformation project, as the National Development and Reform Commission’s “Industrial Structure Adjustment Guidance Catalog” encouraged development category, established at the beginning of the project construction, “Building a first-class digital production line benchmark demonstration project, to achieve the lowest energy consumption, The construction goal of the highest efficiency and the highest level of automation and intelligent equipment. The project is positioned to manufacture high-strength and high-modulus wind power products, adopting advanced production technology and technical equipment in the industry, integrating MES system, ERP system, PLC and DCS industrial computer control system, which can realize the whole process of product production and delivery from the order Digital and intelligent management. After the production line is put into production, key indicators such as NE indicators, man-hour efficiency, energy consumption intensity, and pollutant emissions can all be in line with the industry’s first-class level, which further enhances the core competitiveness of the Fiberglass Group.
During the construction period of the project, Fiberglass Group firmly established the construction concept of “Today’s investment is tomorrow’s cost”, focusing on all-round planning, fully optimized design, and high-quality construction. All the construction staff fully carried forward the spirit of Shandong Fiberglass “doing hard work”, adhering to the corporate culture of “quality and excellence”, and pushing forward the project construction with high standards. The project took only 116 days from the dismantling of the original production line to the ignition of the newly built kiln, setting a record for the shortest construction period of the same scale tank kiln production line in the same industry at home and abroad.
During the “14th Five-Year Plan” period, the Fiberglass Group will take the vision to build a “global leading provider of innovative high-performance fiber materials”, based on the overall requirements of “quality change, efficiency change, and kinetic energy change”, and follow the “supplement supply The development path of “chain, strengthen the production chain, and extend the product chain” will start a new development of “digital” transformation, continuously improve the core competitiveness of the company, and continue to work hard to build a “strong and beautiful” new glass fiber large glass fiber!